2008

SD8218 : Turbine Tower No 23 under construction at Scout Moor

taken 16 years ago, 3 km from Waterfoot, Lancashire, England

Turbine Tower No 23 under construction at Scout Moor
Turbine Tower No 23 under construction at Scout Moor
Turbine No 23 was the very last of the 26 Wind Turbines to be constructed on Scout Moor.
Seen here in early June 2008 the top 22 metre 55 ton tower section has just been lifted into position by the huge mobile crane.

For the more technically minded the crane in the picture is built by the Swiss company Liebherr LinkExternal link
The eight-axle LTM 1500-8.1 above is equipped with a 7-section, 84 m telescopic boom, the longest telescopic boom in the world.
The lifting capacities are increased considerably due to the jib-suspension. The lattice jib, reaching lengths of up to 91 m, extends the operating range of the 500-tonner to 145 m hoisting height and 108 m reach.LinkExternal link

Following a public inquiry held in 2004, planning consent was granted by the Secretary of State on the 25th May 2005 for the building of Scout Moor Wind Farm.
Construction of the wind turbines began back in November 2007 at Turbine No 16 on the right in the picture.
By June 2008 engineers had constructed 26 wind turbine towers and installed 78 turbine blades 450 metres above sea level on Scout Moor amid adverse weather conditions of thick fog, gale force winds, torrential rain, snow and ice during the winter months of 2008.

On the 25th of September 2008 dignitaries from across the North West were invited to the official opening of the Scout Moor wind farm.
Children from Edenfield Primary School, who have enjoyed lessons based around the wind farm, were on hand to cut the ribbon at Turbine No 22.Link

Head Teacher at Edenfield Primary School, Janet Reidy, said: "It was superb for the children to be involved after all the work they had done about the wind farm in their lessons.
I think they will all remember this in future years and now they know what it's like to be film stars with all the camera crews there!"

Richard Dibley, wind power development manager at Peel, said at the opening: "We have welcomed people here today to thank them for their patience and understanding during the construction period and for them to see the wind farm in action at close quarters. I think we have chosen the perfect site here as it is more than 50% windier up here than it is in the surrounding area. These turbines will be generating power for years to come using a natural resource that will never run out."

SD8218 : Turbine Tower No 23 under construction
SD8218 : Turbine Tower No 23 under construction in June 2008
SD8218 : Turbine Tower No 23 construction site
SD8318 : Scout Moor Turbine Towers 15 and 21
SD8219 : Turbine Tower No 26 Under Construction in May 2008
SD7919 : Last Turbine Tower Delivery to Scout Moor

Turbine details: Tower Height: 60m
Blade Length: 40m Total Max Height: 100m
Manufacturer: Nordex
Model: N80 LinkExternal link (Archive LinkExternal link )

Map showing stage of construction in early June 2008
LinkExternal link

Key Facts LinkExternal link (Archive LinkExternal link )

Scout Moor Wind Farm Construction Picture Gallery
Link

Creative Commons Licence [Some Rights Reserved]   © Copyright Paul Anderson and licensed for reuse under this Creative Commons Licence.
Category: Wind farm
1:50,000 Modern Day Landranger(TM) Map © Crown Copyright
+
+
1:50,000 Modern Day Landranger(TM) Map © Crown Copyright
TIP: Click the map for more Large scale mapping
Grid Square
SD8218, 153 images   (more nearby 🔍)
Photographer
Paul Anderson   (more nearby)
Date Taken
Thursday, 5 June, 2008   (more nearby)
Submitted
Thursday, 6 November, 2008
Subject Location
OSGB36: geotagged! SD 829 188 [100m precision]
WGS84: 53:39.9562N 2:15.6163W
Camera Location
OSGB36: geotagged! SD 825 188
View Direction
EAST (about 90 degrees)
Clickable map
+
NW N NE
W Go E
SW S SE
Image classification(about): Geograph
This page has been viewed about 351 times
You are not logged in login | register