2008

SD8218 : Engineers 60 metres up on top of Turbine Tower No 11

taken 16 years ago, near to Cheesden, Rochdale, England

Engineers 60 metres up on top of Turbine Tower No 11
Engineers 60 metres up on top of Turbine Tower No 11
Two engineers wait in the nacelle of the top of Tower No 11 as
SD8218 : Gearbox , Rotor Shaft and Disk Brake Assembly for Turbine No 11 is lifted into position by crane.

SD8418 : The very first completed wind turbine on Scout Moor
SD8417 : Turbine Tower No 10 under construction
SD8417 : Working on the hub 60 metres up.
SD8317 : Aerial View of Scout Moor Wind Farm
SD7919 : Turbine tower section passing Edenfield Primary School

Turbine details: Tower Height: 60m
Blade Length: 40m Total Max Height: 100m
Manufacturer: Nordex
Model: N80


Scout Moor Wind Farm Construction Picture Gallery
Link

Creative Commons Licence [Some Rights Reserved]   © Copyright Paul Anderson and licensed for reuse under this Creative Commons Licence.
Category: Wind turbines
1:50,000 Modern Day Landranger(TM) Map © Crown Copyright
+
+
1:50,000 Modern Day Landranger(TM) Map © Crown Copyright
TIP: Click the map for more Large scale mapping
Grid Square
SD8218, 153 images   (more nearby 🔍)
Photographer
Paul Anderson   (more nearby)
Date Taken
Thursday, 1 May, 2008   (more nearby)
Submitted
Saturday, 3 May, 2008
Subject Location
OSGB36: geotagged! SD 824 181 [100m precision]
WGS84: 53:39.5454N 2:16.0496W
Camera Location
OSGB36: geotagged! SD 824 180
View Direction
NORTH (about 0 degrees)
Clickable map
+
NW N NE
W Go E
SW S SE
Image classification(about): Supplemental image
This page has been viewed about 283 times
You are not logged in login | register