2008

SD8218 : Turbine Tower No 22 under construction

taken 16 years ago, 3 km from Edenfield, Lancashire, England

Turbine Tower No 22 under construction
Turbine Tower No 22 under construction
At 450 metres above sea level these two turbines are at the highest point on Scout Moor.
The first of three blades is seen here being attached to Turbine No 22 which was completed on Monday the 19th of May 2008.
Turbine No 24 on the right was completed on Friday the 16th of May 2008.
SD8218 : Tightening the bolts at Turbine No 24
SD8318 : Scout Moor Turbine Towers 15 and 21
SD7919 : Turbine tower section passing Edenfield Primary School
SD8418 : The very first completed wind turbine on Scout Moor
SD8417 : Turbine Tower No 10 under construction
SD8417 : Working on the hub 60 metres up.

Turbine details: Tower Height: 60m
Blade Length: 40m Total Max Height: 100m
Manufacturer: Nordex
Model: N80

Scout Moor Wind Farm Construction Picture Gallery
Link

Creative Commons Licence [Some Rights Reserved]   © Copyright Paul Anderson and licensed for reuse under this Creative Commons Licence.
Category: Wind turbines
1:50,000 Modern Day Landranger(TM) Map © Crown Copyright
+
+
1:50,000 Modern Day Landranger(TM) Map © Crown Copyright
TIP: Click the map for more Large scale mapping
Grid Square
SD8218, 153 images   (more nearby 🔍)
Photographer
Paul Anderson   (more nearby)
Date Taken
Monday, 19 May, 2008   (more nearby)
Submitted
Tuesday, 20 May, 2008
Subject Location
OSGB36: geotagged! SD 825 188 [100m precision]
WGS84: 53:39.9339N 2:15.9612W
Camera Location
OSGB36: geotagged! SD 827 187
View Direction
West-northwest (about 292 degrees)
Clickable map
+
NW N NE
W Go E
SW S SE
Image classification(about): Geograph
This page has been viewed about 224 times
You are not logged in login | register