2008

SD8219 : Turbine Tower No 26 Under Construction in May 2008

taken 16 years ago, near to Waterfoot, Lancashire, England

Turbine Tower No 26 Under Construction in May 2008
Turbine Tower No 26 Under Construction in May 2008
At the end of May 2008 construction began on Turbine No 26 which is the most northern of all the Turbines on Scout Moor.
In the picture above the base section of the Tower is about to be lifted into position.
SD8318 : Scout Moor Turbine Towers 15 and 21
SD7919 : Turbine tower section passing Edenfield Primary School
SD8418 : The very first completed wind turbine on Scout Moor
SD8218 : Turbine Towers 22 and 24 at Scout Moor
SD8218 : Tightening the bolts at Turbine No 24
SD8218 : Base section of Turbine Tower No 24

Turbine details: Tower Height: 60m
Blade Length: 40m Total Max Height: 100m
Manufacturer: Nordex
Model: N80
Scout Moor Wind Farm Construction Picture Gallery
Link

Creative Commons Licence [Some Rights Reserved]   © Copyright Paul Anderson and licensed for reuse under this Creative Commons Licence.
Category: Wind turbines
1:50,000 Modern Day Landranger(TM) Map © Crown Copyright
+
+
1:50,000 Modern Day Landranger(TM) Map © Crown Copyright
TIP: Click the map for more Large scale mapping
Grid Square
SD8219, 36 images   (more nearby 🔍)
Photographer
Paul Anderson   (more nearby)
Date Taken
Thursday, 29 May, 2008   (more nearby)
Submitted
Friday, 30 May, 2008
Subject Location
OSGB36: geotagged! SD 825 193 [100m precision]
WGS84: 53:40.1981N 2:15.9811W
Camera Location
OSGB36: geotagged! SD 825 192
View Direction
NORTH (about 0 degrees)
Clickable map
+
NW N NE
W Go E
SW S SE
Image classification(about): Geograph
This page has been viewed about 354 times
You are not logged in login | register