2008

SD8218 : Turbine Tower section delivery on Scout Moor

taken 16 years ago, 3 km from Cheesden, Rochdale, England

Turbine Tower section delivery on Scout Moor
Turbine Tower section delivery on Scout Moor
A lowloader, carrying the huge middle 22 metre 54 ton tower section for Turbine Tower No 5, makes its way over Scout Moor towards the construction site.
The completed turbine on the left of the picture is Tower No 21
which was the very first of the 26 turbines to be built on Scout Moor.

SD8418 : Turbine Tower Number 21
SD8218 : 54 Tons and 22 metres Long
SD8417 : Working on the hub 60 metres up.
SD7919 : Scout Moor Wind Farm Delivery Market Street Edenfield
SD7919 : Last Turbine Tower Delivery to Scout Moor

Turbine details: Tower Height: 60m
Blade Length: 40m Total Max Height: 100m
Manufacturer: Nordex
Model: N80 LinkExternal link (Archive LinkExternal link )

Key Facts LinkExternal link (Archive LinkExternal link )

Scout Moor Wind Farm Construction Picture Gallery
Link

Creative Commons Licence [Some Rights Reserved]   © Copyright Paul Anderson and licensed for reuse under this Creative Commons Licence.
Category: Wind farm
This photo is linked from: Galleries: · Scout Moor Wind Farm Under Construction Automatic Clusters: · Turbine Blade Delivery to Tower [11] · Ton Tower Section [10] ·
1:50,000 Modern Day Landranger(TM) Map © Crown Copyright
+
+
1:50,000 Modern Day Landranger(TM) Map © Crown Copyright
TIP: Click the map for more Large scale mapping
Grid Square
SD8218, 153 images   (more nearby 🔍)
Photographer
Paul Anderson   (more nearby)
Date Taken
Monday, 14 April, 2008   (more nearby)
Submitted
Wednesday, 1 October, 2008
Subject Location
OSGB36: geotagged! SD 829 187 [100m precision]
WGS84: 53:39.9132N 2:15.5797W
Camera Location
OSGB36: geotagged! SD 828 187
View Direction
EAST (about 90 degrees)
Clickable map
+
NW N NE
W Go E
SW S SE
Image classification(about): Geograph
This page has been viewed about 142 times
You are not logged in login | register